Air Monitoring & Clearance Testing

Professional air monitoring and four-stage clearance certification following asbestos works.

Air tests can be arranged at short notice
Air Monitoring & Clearance Testing

When Is This Required?

Required under CAR 2012 and HSG248 during and after asbestos removal works. Four-stage clearance is mandatory before an area can be reoccupied following licensed removal.

Who Needs This?

Licensed asbestos removal contractors
Building owners overseeing removal projects
Project managers coordinating clearance
Local authorities enforcing compliance

Purpose

To assess airborne fibre concentrations and verify safe reoccupation following asbestos removal or disturbance, in accordance with HSG248 and CAR 2012.

Comprehensive Overview

Air monitoring and clearance testing are essential components of any asbestos removal or remediation project. Under the Control of Asbestos Regulations 2012 and HSG248 guidance, air monitoring must be conducted during and after asbestos works to verify that fibre levels remain below the control limit, and a formal four-stage clearance process is mandatory before reoccupation of areas where licensed asbestos removal has taken place.

Background Monitoring: Before asbestos works commence, we establish baseline fibre concentrations in the surrounding area. This provides a reference point for comparison during and after works, and confirms that background conditions are within acceptable limits before the enclosure is erected.

Leak Testing: During licensed removal works, air samples are taken around the enclosure perimeter to detect any fibre leakage. This ongoing monitoring ensures the integrity of the containment is maintained throughout the removal process. Any breach is immediately identified and reported to the removal contractor for corrective action.

Reassurance Monitoring: Personal and static air samples are taken in occupied areas adjacent to asbestos works to provide reassurance to building occupants and employers that fibre levels remain within safe limits. Results are compared against the workplace exposure limit (WEL) of 0.1 fibres per cm3.

Four-Stage Clearance: Following licensed asbestos removal, we conduct the full four-stage clearance procedure as required by HSG248. Stage 1: preliminary check of site condition and completeness of removal. Stage 2: thorough visual inspection under controlled lighting conditions. Stage 3: disturbed air sampling to simulate worst-case conditions. Stage 4: final assessment confirming the area is safe for reoccupation. A Certificate of Reoccupation is issued only when all four stages are satisfactorily completed.

Fibre Counting and Analysis: All air samples are analysed using phase contrast microscopy (PCM) in accordance with the WHO method (HSG248). Fibre counts are reported with full analytical data and compared against the relevant clearance indicator (0.01 fibres per cm3 for clearance testing).

Our analysts are experienced in supporting both licensed removal contractors and building owners, providing the independent oversight required for regulatory compliance and client confidence.

Key Features

HSG248 compliant methodology
Full four-stage clearance procedure
Phase contrast microscopy analysis
Certificate of Reoccupation issued
Independent of removal contractors
Short-notice availability for urgent projects

What You Receive

  • Background air monitoring results
  • Leak test results during removal works
  • Reassurance monitoring certificates
  • Four-stage clearance test reports
  • Certificate of Reoccupation
  • Fibre concentration analysis with full data
  • Compliance documentation for HSE records
  • Post-clearance site condition photographs

Timescale

Air tests can be arranged at short notice. Results typically available within 24 hours of sampling.

Pricing

DomesticContact for pricing
CommercialContact for pricing

Priced per test/clearance. Volume discounts for multi-stage projects.

Frequently Asked Questions

Common questions about air monitoring & clearance testing.

Book Your Air Monitoring & Clearance Testing

Same-day availability. Reports in 24-48 hours. BOHS P402 qualified surveyors.

Air Monitoring & Clearance Testing Across the South East

We provide air monitoring & clearance testing services across Essex, London, and the wider South East. Select your area for local information.

Book This Service Today

Same-day booking available. Speak directly with a BOHS-qualified surveyor about your requirements.